Project overview
The WSAGA Drinking Water Project has delivered trunk main drinking water infrastructure to service Western Sydney Aerotrpolis (WSA) priority growth precincts. The area was serviced via a rural water supply network within the Cecil Park Water Supply Zone (WSZ) which had limited capacity to service planned growth.
This project includes three trunk water mains that will enable servicing for the new Western Sydney Airport and construction water for major infrastructure, including the M12 Motorway and Sydney Metro.
Delivery Partners:
HDD work
- UEA
- Pace Drilling
- Eastern Underground
Trenching works
- Quick Way
- Ferrycarrig
- Deep Civil
Bore Works
- Bothar
- Bortec
Did You Know
This is the second largest pipe installation ever done in Australia and the largest that has ever been done by Sydney Water.
The facts:
Elizabeth Drive:
- Install 999m of OD 813 steel watermain
- HDD of two creek crossings in DN1000 HDPE (total 700 lin/m) Thrust bore 180m
Luddenham Road:
- Install 3770m of OD 560 HDPE
- 50m thrust bore to Elizabeth Drive
- Open cut road crossing for six offtakes
Badgerys Creek Road:
- Install 1096m of OD 560 HDPE
- HDD 2334m of OD 180 HDPE
for the HDD works